# 0 items
Your Shopping Cart is empty!
Your Product Price
Supply Chain
Categories
Sign in or Join Free Now!
EU ErP IEC60969 Lamp Start Run-up time and Flicker Test
EU ErP IEC60969 Lamp Start Run-up time and Flicker Test
  • >= 1  Set US $1.000
Supply Ability:
1000 Set/Sets per 0
Port:
Shanghai
Your Email:
Quantity:
Set
  • Product Detils
  • Company Profile
Quick Details
Place of Origin:
China (Mainland)
Brand Name:
LISUN
Model Number:
LSRF-3
Product Description

LSRF-3 is equipped with Class A fast photometric probe, so the sampling speed is up to 100kHz. It fully meets the requirement of BASIC, Energy Star V2.1, IEC TR 61547-1:2020 IEC-Pst, CA CEC, ASSIST, CIE TN006-2016 CIE SVM, IEEE Std 1789 standards, etc. It is professional for flicker test of LED lights and lamps, energy-saving lamps, etc. According to EU directives 1194/2012, 2009/125 / EC, SASO2902, EU2019/2015 - EU2019/2020 and IEC60969 "Self-ballasted Lamps for General Lighting Services—Performance Requirements" and other requirements.

1. Lamp Flicker test interface (Need to work with LISUN Integrating Sphere, DC Power Source and Standard Light Source, it also can be added in LISUN LPCE-2 or LPCE-3 Integrating Sphere System):

LSRF 3 Lamp Start, Run Up Time And Flicker Test System 1

LSRF 3 Lamp Start, Run Up Time And Flicker Test System 4

2. Lamp Start and Run-up Test: the LSRF-3 needs to work with LISUN's LSP-500VARC AC Power Source (With Trigger Function) or LSP-500VARC-Pst (IEC-Pst AC Power Source) to test the Start and Run-up time of lamps which is according to clause 11.4 Start Time Test Method & clause 11.5 Run-Up Time Test Method in the US Standards of Energy Star V2.1, and SASO2902 Table 13:

LSRF 3 Lamp Start, Run Up Time And Flicker Test System 5

3. According to IEC TR 61547-1:2020, The LSRF-3 do the Light Pst V measure on AC Stable as below Figure 1a , and also can do the Light Pst LM(I) measure on AC Fluctuation as below Figure 1b. Note:  The Light Pst LM(I) measurements need to work with LISUN's LSP-500VARC-Pst (IEC-Pst AC Power Source)


Light Pst LM and Pst LM (I) Flicker Test Principle in IEC TR 61547-1:2020 Programmable AC Power Signal Output when do Flicker Immunity Pst LM(I) test in IEC TR 61547-1:2020


Please use the factory-direct-buy message to contact us. We will reply in 24 hours.
Not exactly what you want? 1 request,multiple quotations Get Quotations Now >>
Sent your message to this supplier
To:
Cherry Shen
Email:
Message:
Your message must be between 20-8000 characters
Quantity:
Set
Recommend matching suppliers if this supplier doesn’t reply on Message Center within 24 hour.
  • For better quotations,include
  • -A self introduction
  • -Special requests,if any
  • View Sample

China (Mainland) | Manufacturer

Experience:Established 2003

Product quality protection
You May Like
www.wfdbn.com
www.wfdbn.com
 Scan QR Code
of the Facebook

鲁公网安备 37079402001083号

ICP备案证:鲁ICP备16006822号-6